We are almost at the finish line with our building, we have passed 6 inspections and have 4 to go, the children are sooo excited to get into their own school. I could use some help this weekend with the following:

Moving furniture
cleaning windows
putting up clocks
painting

MOST IMP: HANDYMAN

Our last thing required for final inspection to to put in (16) exhaust fans in the bathrooms. The electrical work is done, it is just installing them through the roof. If anyone can help with this it would be great.

Thanks, Gladys

p.s. help during the week is also accepted....